DENTISTS PATIENTS NEW FIND A DENTIST DENTAL TECHNICIANS CONTACT US CALENDER(.pdf file) Links
STICK BOND DENTAL 

STICK BOND SOLUTIONS:    CASE STUDY 3 - Dr JJ Jansen van Rensburg

UR5- broken off on gum level, UR4- extracted, UR3- huge amalgam filling
1.  Pre-operative 

UR5- broken off on gum level

UR4- extracted
UR3- huge amalgam filling

 

2.  Palatal View

UR3-filling present on pal. Side

 

 
3.  Everstick fibre post

Measure the length of the post with endodontic reamer and stop

 

 
4.  Everstick Fibre Post

Light cure posts in mouth

 

5.  Everstick Fibre Post

Light cure rest of post outside the mouth

 

6.  Everstick Fibre Post

Posts wetted with Everstick Resin

 

7.  Everstick Fibre Bond

Post bonded in with Nexus dual cure cement

 

8.  Composite Build Up

Sectional matrix and wedge

Z100 build up layer by layer

 

9.  Build up complete

 

 

10.  Build up complete 11. Follow-up after two weeks 12.  Follow-up after two weeks  
RETURN TO CASE REPORTS
HOME

 

Please click on logo to visit our online shop.

 

 

 

Our mission is to empower dentists to make the maximum use of technology

DENTISTS PATIENTS NEW FIND A DENTIST DENTAL TECHNICIANS CONTACT US CALENDER(.pdf file) Links

Copyright © 2005 Stick Bond Dental CC  All rights reserved
Revised: 14 Dec 2005 16:17:47 -0000