1 Pre-op buccal view – note severe
periodontitis on tooth number 14 |
2
Tooth number 14 extracted

|
3
Extracted tooth – note the evident bone loss

|
| 4
Root cut, cleansed and retrograde filling

|
5
Extracted 14 prepared as an immediate pontic

|
6
Ozone treatment

|
|
7 Pontic
“spot-etched”

|
8
Guiding trench preparation

|
9
Placing the fibres

|
| 10
End result labial view

|
11
End result, occlusal view

|
12
Buccal view with rubber dam removed

|
| 13
Occlusal view with rubber dam removed

|
14 Palatal view with rubber
dam removed

|
Click here for more
details regarding our Hands-on Training Courses:
Dates
Registration
and costs
|
| Stickbond
Dental Techniques
1:
Periodontal Splinting Step by
Step
Immediate Bridge Construction
Occlusal
Splinting and the prevention of food impaction
Stick Bond Dental Techniques
2
The
crown that keeps on falling out
Combination of tooth
replacement and periodontal splinting
Strengthening large composite
restorations
|
Stick
Bond Dental Techniques
3
Trauma splint
Stick
Bond Dental Techniques 4
|
Further
techniques:
Attrition
Anatomical
Posts
Direct
Bridge
Semi
Direct Bridge
Direct
Longspan Bridge
|
| HOME
Copyright ©
2006
Stick Bond Dental CC All rights reserved
Revised: 18 Mar 2006 17:42:40 -0000
|